THE PROJECT GOALS
This project is an improvement to an existing project done in 2010.
- ELECTRICAL POWER TO THE VILLAGE OF AKAZOMBY
- PROVIDE FILTERED CLEAN WATER TO THE VILLAGE
- PROVIDE POWER FOR LED LIGHTING FOR THE HOMES IN THE VILLAGE
- PROVIDE ELECTRICAL POWER FOR VILLAGE NEEDS
Phased Approach
Phase 1: Planning , Design & Early Work
Phase 2: Final Implementation and Start-up
REALIZATION OF THE PROJECT GOALS
- Purchase and installation of a solar panel of 5KVA
- Power for LED Lighting for 11 homes
- Transport and distribution of electricity (500 m cables)
- Pump & Piping
- Construction of infrastructure for water filter
- Purchase and put into action a 2 horsepower and a ¾ horsepower energized by solar panel
- Repair HDPE pipes have been gnawed by rats and replaced by PVC pipes
- Repair of the water spigots at the 3 locations